Voice-Data-Service T1 Survey

INCOM3 can save you upto 50% of your current Voice and Data Service Please complete form bellow. For assistance contact us at 877-817-0227.

Telecommunications

Guidelines for Support Structures

For Circuit Installation

Requirements for circuit delivery are as follows:

  1. 2" to 4" Schedule 40 PVC or metallic conduit(s) from the property line to the building(s).
  2. A closet or equipment room to locate telecom equipment. Floorspace requirements vary depending on the size and characteristics of the building.
  3. One or more 120VAC power outlets. Some buildings may require 240VAC.
  4. 4' X 8' X 3/4" plywood backboard(s)
  5. Conduit, ceiling space, under floor duct or other type of enclosed raceway from equipment rooms to tenant spaces.
  6. 4" riser sleeves between floors of a multi-story building. Firestop material to be installed after cable placement.
  7. #6 AWG insulated wire from the building's grounding electrode system. Larger diameter wire may be needed in some cases.

 

Note: If your services are being extended from the circuit to a suite, a pull string is required.

Voice and Data Site Survey

Your form message has been successfully sent.
You have entered the following data:

Survey Form:

Please correct your input in the following fields:
Error while sending the form. Please try again later.

Note: Fields marked with * are required